Bulletin W14-022 – AUS Switch Policy

February 13, 2014Bulletins

Topic included in Bulletin W14-022:

  • CMS now permits LP or DU to be run as the initial AUS on a loan
  • Note; DU is the preferred AUS of CMS and current guidelines are DU focused
  • All AUS versions run on the loan must be included with the loan submission
  • The Credit Policy and “Submit to Processing Checklist” have been updated and can be found on the Intranet
  • Update effective immediately

Download: Bulletin – W14-022 (PDF)

Latest Advertisement